The overhang to the next strip should be 3 8 inch.
How much overhang on roofing felt.
A conventional roll of felt is enough for 432 square feet.
Metal is usually installed on rafters or strip sheathing rather than the solid decking used under other materials.
Greater overhang becomes a point of leverage for gusts of wind to rip off your roofing.
All nails and staples should be placed on the lower half of the paper.
Multiply those numbers and then double the result for the square footage of your roof.
Before you start to install corrugated metal roofing you need to figure out how much you need.
The paper should then be nailed in or stapled every three to four inches across.
The vertical leg of the drip edge should be at least 1 5 inches wide and extend at least 0 25 inches below the sheathing.
The overlapping felt creates a secondary barrier for moisture and wicks water away from the shingles above and the sheathing below.
Measure the length of the roof and the breadth of one side.
Roofing felt is required to overlap 2 inches over the lower felt course.
This should give you a 1 inch overhang on the eaves including the top edge of the installed drip edge trim installed in step 1.
Since you will have overlap between rows this works out to a total coverage area of 400 square feet the dimensions of a 20 x 20 roof.
Here phil explains how much overhang a roof should have at the gutter.
Points to the first course of 15 roofing felt on this roof.
Therefore a 2 inch overlap provides redundancy at the edges where the barrier is weakest.
Video of the day.
About 1 inch just enough to assure the water goes into the gutter and not behind it.
Just below we illustrate shingles installed with too much overhang into the gutter.
Corrugated metal roofing generally comes in sheets that are 3x6 feet in size 18 square feet.
A typical metal roof overhang may be 2 to 4 inches or even less.
Some slight overhang is recommended in conjunction with a drip edge flashing to prevent water from getting under the roofing and onto underlying wood.
Adjacent pieces of drip edge should overlap at least 2 inches 51 mm.
Make sure you have enough roof felt you don t want to have to stop mid way through the project to buy more felt.
The drip edge should extend at least 2 inches on the roof.