Four to 6 in.
How to build a strong header for garage door.
The procedure for constructing a header for 6 inch exterior wall framing can be modified for any wall thickness.
Of base material laid down and compacted.
From the final grade vinyl siding can be touching the ground and fiber cement can be within 2 in.
Calculating header size is no picnic as you learn how to.
Header the header is ideally a minimum 12 wide micro laminated beam that spans the width of the garage door opening.
You will need to add 1 2 of plywood between the 2x4 s to get the right wall thickness of 3 1 2.
Cut the door header.
Concrete with a 4 000 psi mixture.
To make the door header the top of the door frame cut two 2x4s to the same length as the width of the original opening and nail them securely together.
Wide window and door openings and in most situations be code compliant for openings up to 6 ft.
Wood garage door framing sheathing and wood siding need to be 6 in.
This piece of.
This is the actual thickness of a 2x4.
Cut a 2 x 6 piece of lumber and nail to the face of wall exactly in the center of the garage header.
In the case of 2x4 framing where the wall is about 3 5 thick the pair of headers will be around 3 3 25 thick and a spacer can be omitted if you are lazy.
Portal frame details within the irc specify simple span headers with a maximum finished opening width of 18.
When in doubt build a double 2 12 header sandwich like we explain next.
Header requirement 2 at minimum the header should be 12 wide with doubled 2 4 at opening and ceiling running the width of the door with a 2 4 in the center of the opening for the center bracket to attach to.
Attach lumber to the face of the garage wall to the edge of the garage door header.
In an attempt to construct portal frames some garages are built with one continuous garage header extending over two or three garage door openings as shown in figure a.
The header is often made from a pair of 2x6 s cut to width and nailed together with a spacer in between to make the total header thickness the same as the wall.
Last pull a measurement from the top of the 2 x 6 piece of lumber that you just installed to the ceiling of the garage.